The construction of the railway station Forlanini FS is connected to the realization of the M4 Metro line of Milan. Forlanini FS station, which has been opened in May 2015, allows to connect the system of the suburban railway lines (S5, S6 and S9) to Linate city airport, thanks to line M4.
During the movement of the tracks, the construction of platforms and access stairs, the crossed tracks were monitored using the RDS Railway Deformation System, while the biaxial clinometers checked any possible rotation of the D-walls.
Data have been registered with a datalogger able to alert in case of thresholds overcoming and managed with a WEB service for data visualization.
The RDS solution, with tiltmeters, WMS web platform and OMNIAlog datalogger allowed a true active railway monitoring.